It is due the 16th of this month but I would like to have it by the end of tomorrow so that I can read it and work with it with my partner

Hello sir,

This is part 3 of the same homework you have done for part 1 and 2. This one is a little different but it is related to the same topic. This is the homework:

  • Choose one unique part of the building, either a room, a structural element (like a tower, staircase, entry) or sequence of spaces and after approval from the instructor plan the systems and processes needed to translate the design to reality. You should consider materials, structural systems, construction techniques, transportation, etc. as if you were the construction manager in charge of this part.
  • You will need to explain what problem-solving strategies required for the construction of the building.
  • You will explain this section in rough form to a partner(s) for feedback. Your explanation and feedback to partner(s) is 30% of your grade for this part.
  • You may use bullet points to outline the steps, but they must use parallel grammatical format.

Can you do it. It is due the 16th of this month but I would like to have it by the end of tomorrow so that I can read it and work with it with my partners.